Showing posts with label airport. Show all posts
Showing posts with label airport. Show all posts

Monday, August 29, 2016

ACT Government release new rapid bus routes and bus expansion for 2017


The ACT Government today released details of new rapid bus routes and expansion to the ACTION Bus fleet, accompanied by funding details to support the expansion. These improvements to the bus network are aimed at increasing public transport patronage and have been planned to follow growth along public transport corridors. In time, several of these routes are likely to be replaced by light rail. The start of light rail service in late 2018 will free up over one million bus kilometres that can be allocated across the ACTION Bus network. It is the equivalent of buying a new fleet of buses and extra drivers.

The new routes include expansions of existing bus routes to enhance the 'rapid' aspect, and completely new routes. Importantly, funding is attached to the plans - $55 million for the services and $51 million for 80 new buses and a new depot to house them. This is a government announcement, not an election policy, with funding to be allocated in the pre-election budget update.

Buses and light rail will always coexist in an integrated transport plan, and we need to make sure we get maximum utility and value from our bus fleet. The big picture plan is that we need more people using public transport.  Light rail, more buses, better frequency, better routes. It's a very compelling plan, and achievable.

The only way to convince Canberrans to use public transport over the private car, is to offer reliable, frequent and attractive public transport. Bus fleet renewal, expanding the reach and frequency of bus services, integrating bus services with light rail and planning for future expansion provide that alternative. This will also lead to reduced travel times and reduced road congestion.

Seven new lines are added to the current Blue and Red Rapid services, with new services supporting Woden, Weston Creek and Canberra Airport every six minutes during peak times and every 15 minutes at other times. The network expansion starts with Belconnen to Gungahlin and Woden to the City rapid services commencing in 2017.

The announcement of new rapid services in 2017 follows on from last weeks announcement of extensions of the Blue Rapid bus from Lanyon to Kippax, and the introduction of a new ACTION Timetable on 27 August. In 2017 a new Green Rapid from Woden to the City via Manuka and Barton, and the Black Rapid from Belconnen to Gungahlin will commence. 

These new services will be phased in through to 2020.
  • Woden to City via Weston Creek (2018)
  • Belconnen to Watson via Dickson (2018)
  • Tuggeranong to City via Erindale (2019)
  • Lanyon to Airport via Barton (2020)
  • Belconnen to Airport via City (2020)
It may appear as if these are simply extensions to existing routes, that is not correct.
  • The Green Rapid is a new route from Woden to the City via Manuka and Barton
  • The Grey Rapid is a new line that goes from Belconnen to Watson via Dickson
  • The Purple Rapid is a new line that goes from Tuggeranong to Civic via Erindale, Woden and Barton
  • The Pink Rapid is a new line that goes from Lanyon to the airport via Tuggeranong, Woden, Barton and Russell
  • The Yellow Rapid is a new line that goes from Belconnen to the airport via Civic and Russell
Also important things to note about the new Rapid Network:
  • All rapid services will run at least every 15 minutes everyday with increased frequency during peak periods
  • The Blue Rapid now extends to Kippax and Lanyon
  • The Black Rapid from Belconnen to Gungahlin will have increased frequency 
  • These routes have most likely been planned thoroughly using data available to the government (MyWay, traffic)
  • These routes have been depend on the fact that light rail will be implemented, which will free up more than 1.2 million kilometres of bus travel

Transport Minister Meegan Fitzharris said "When people know that there's always going to public transport where they need it ... that really drives patronage," "That's exactly what these rapid bus services already do and what future rapid bus services will do."

Minister Fitzharris also said that the debate about Canberra being a car-centric city was over and more rapid bus routes were planned for Molonglo and Gungahlin as the population grew.

The new bus route plans differ markedly from the release earlier in 2016 of the Canberra Liberals bus plans, in that they are funded, are based on research and future population patterns, and integrate light rail services with future transport planning.

ACT Government media release
Canberra Times article 'ACT Govt announces seven new rapid bus routes in network overhaul' here
ABC News Online 'Labor reveal nine line Rapid Bus network for Canberra' here

WIN TV Canberra covered the announcement on the 29 August 6PM TV News

ABC TV Canberra covered the announcement on its 29 August 7PM TV News


For more frequent updates on Capital Metro and light rail related news, please visit our Facebook page 'Light Rail for Canberra'.  

Wednesday, October 23, 2013

Canberra Airport and their vision for light rail



Stephen Byron of the Canberra Airport group recently released a concept video of his 'Connecting Canberra by light rail' proposal for an inner Canberra light rail network, servicing mainly the Parliamentary Triangle and areas between it and the Canberra Airport. He proposes construction in three stages, that would link to the (already built by then) Capital Metro running from Gungahlin to Civic. Accompanying this vision was a Canberra Airport run feedback/information gathering process.

As the Canberra Airport have not indicated if they propose to pay for any light rail construction, the plans are more of a conceptual contribution to the light rail discussion, than a shovel ready engineering proposal. What it does show is that there are competing visions and that the airport and Brindabella Business Park must be included in future light rail planning. 




Here is a map of the full light rail network proposal from the Canberra Airport. It is important to understand that the airport is located at a transport bottleneck where Majura Road, the Monaro Highway, Limestone Avenue and the road to Queanbeyan all merge. Its a road congestion bottleneck, and it is also where the people trying to access the airport and the recently constructed Brindabella Business Park have very few public transport options.  Better transport solutions are needed.

The Airport proposal covers the Parliamentary Triangle and then runs through the suburbs near it and through the industrial area in Fyshwick, to the Airport. It also runs from the Airport, through Russel and along Constitution Avenue to Civic. It also proposes a line out past ANU and taking in the area along the Lake Burley Griffin foreshore where the 'City to Lake' proposal would locate a new Convention Centre and sports stadium. 
Stage 1

The proposed first stage would link the Capital Metro Civic interchange with a line running down Constitution Avenue through Russell, past Duntroon to the Airport. It appears that the Airport see light rail as more tram-like and on-road, rather than the separate reserve model that will be used on the Gungahlin to Civic route. 

This would be a good second line to construct, as both Russell and Brindabella Business park require good public transport connections to resolve parking demand (especially when paid parking is introduced in Russell). Constitution Avenue is also undergoing urban renewal, with a significant residential construction program occurring in Campbell on the Anzac Parade/Constitution Avenue area. 

More residents in high density housing, more office space being constructed and paid parking coming in - it's a trifecta of demand creation for public transport. 

The link out of Civic to the west takes in ANU and a revitalised Civic West area, rapidly filling up with new residential space and refurbished office space. This area is undergoing refurbishment as the stock of mostly 30 year old plus office stock is updated or converted to residential, or pulled down and replaced with a mix of the two. 
Stage 2

Stage 2 proposes a link that runs between a terminal in Russell, across the lake and through the Parliamentary Triangle in Barton, then across the lake again, veering west along the foreshore and connecting to the City West extension from Stage One. 

Its a good idea, especially the servicing of Russell and Barton and alleviating parking demand in the major government departments in that area. Unless you drive in from Woden or Tuggeranong. It would require significant investment as the construction of bridges across the lake would not be inexpensive. Perhaps parking revenues from the Parliamentary Triangle paid parking could be directed towards this. 

The Canberra Times were particularly interested in the bridge construction angle of this stage. They sought ACT Light Rails views on this and published an article the day after the airport light rail proposal came out, exploring this aspect of the plan. 

Damien Haas, of lobby group ACT Light Rail, praised Canberra Airport managing director Stephen Byron for proposing the light rail extension. Mr Haas said additional bridges might have to be built across Lake Burley Griffin to accommodate light rail.

"Once Civic to Gungahlin is in, I think bridge-to-bridge would be a logical extension,'' Mr Haas said.

"Certainly, probably the major investment would be putting those two bridges in and that would satisfy a lot of public transport issues in the parliamentary triangle.''

Mr Haas said a light rail connection between Civic and the airport would need high rates of usage to be viable.

"The only way that light rail from Civic to the airport would work would be with the commuting volume of both Russell and Brindabella Business Park workers using it,'' Mr Haas said.


This proposed second stage would require on-road running and not seperate-reserve running. Much of it, for example, the long sections across the lake, would of course be on their own reserve. 

Demand for this stage would come not only from commuters working in Russell, Civic West and Barton, but also from out of peak hour demand from tourists and workers making trips to Civic and back to their office during the day. On weekends and especially at special events around the lake this stage would be used heavily. 
Stage 3

The third stage is the least likely to ever eventuate, and it's doubtful that a version of this exists on even the ACT Governments secret light rail routes file (if it exists). It proposes another loop from the airport, to Fyshwick, along Canberra Avenue and then instead of going all the way along Canberra Avenue to Parliament House, it veers east towards the Kingston Foreshore along then turns west up to Kingston and Manuka before turning again to go to Parliament House and then down Kings Avenue to meet up with the 'Lake Loop' proposed in Stage 2. 

Other aspects of the Canberra Airport light rail plan show a proposed High Speed rail terminal at the Canberra Airport, instead of Ainslie Avenue. 

Conclusions

It is a bold plan from the Canberra Airport, and they should be commended for the effort they have put into their contribution to the debate. The Civic to Airport line has great merit, especially as their are significant demand factors from employees at both Russell and Brindabella Business Park, and also from the redevelopment along Constitution Avenue and the new office and residential demand that will come from that. The introduction in paid parking at Russell will help drive that demand for public transport. 

The second and third stages are more problematic. A line out of Civic across the lake will be required if the true potential of light rail for mass transit is to be realised - by running a line out to Woden and Tuggeranong to take the load off ACTION buses, and enable ACTION to increase local area frequency to light rail stations along that route. 

The odd route of the airports proposed stage 3 western loop section do not seem likely to eventuate. It would be more logical to run a light rail line from the Queanbeyan/Canberra border near HMAS Harman, all the way along Canberra Avenue to Parliament House, and then meet with a line running from Civic to Tuggeranong. These are long term goals.    

Ultimately the role of light rail in Canberra needs to be determined. Do we want light rail to serve as mass transit or as an on road tram-like service that operates in inner Melbourne suburbs? 

We already have a bus service that can perform that role. Canberra would be best served by building light rail where it can serve as a mass transit technology, and allow the flexibility of ACTION Buses to connect to it. We can then leverage both our existing transport infrastructure and new transport infrastructure in the most effective way and increase public transport patronage and access to transport options for urban redevelopment and planned growth of our city over the long term. 

The Canberra Airport proposal has great merit in that it offers the same long term vision, as others in the public transport debate sphere. Like all proposed routes for light rail, some compromises will have to be made, but ultimately it is best to integrate our existing transport options into our new transport options in the way that will best drive patronage.  


Stay up to date with light rail in Canberra by joining our facebook group!